Kupal Supplementary Gas Injection

Project Name:

Kupal Supplementary Gas Injection

 

Location:

Khousestan- Ahwaz

 

Client:

N.I.S.O.C

 

Contract Scope:

Detail Engineering and Engineering Procurement Services

 

Partners:

Tehran Berekly (as main contractor)- Satrap Jonub

 

Awarded Data:

2011

 

Completion Date:

70%

 

Engineering Man-Hour (PFA Share):

35,000

 

Project Description:

N.I.S.O.C. has defined the Kupal Supplementary Gas Injection to increase the capacity of injection up to 300 MMSCFD, beside the existent state on EPC conditionals. The required gas is supplied by a 20" pipeline with almost 37 Km length. Other utilities are: an external 132/11 KV post and related power transmission line., instrument air compressors, dryers, nitrogen generation package, control building, MCC, Guard house, work shop and …